Autor Thema: Mixing Demand Contact and Timetable Routes in one ZFA File  (Gelesen 235 mal)

Offline Andy Foster

  • Junior-Mitglied
  • Beiträge: 19
Dear All

I have 5 routes in my ZFA file that run automatically by Demand Contact. This allows me to run 3 trains simultaneously in a loop. I would like to run these routes for 5 minutes and then switch the same 5 routes to a timetable operation.
Is there a way that this can be done?.

Thanks

Andy